Slide 1 jFlow Plus

Huge National Strategic Importance.

The LNG Terminal moves about 50% of the natural gas consumed in Portugal, since it constitutes an alternative to the land pipeline.

Slide 2 jFlow Plus

Terminal capacity

The installation has three storage tanks for liquefied natural gas, with a storage capacity of 390 000 m³.

Slide 3 jFlow Plus

Terminal emission capacity

Has a nominal emission capacity of 900 000 m³(n)/hour, a maximum capacity of 1 350 000 m³(n)/hour and it can load up to 4 500 tanker trucks a year.

Slide 3 jFlow Plus

Docking station

For ships with a capacity from 40 000 to 216 000 m³ GNL with an unloading time of about 20 hours.

Today 21
Sines Municipality
17° 14° / 17°
  • CLOUDY
  • PRESSURE 1017MB
  • HUMIDITY 90%
  • WIND 35.40KM/H
  • 7:23 AM
  • 7:33 PM
Tomorrow 22
Sines Municipality
16° / 20°
  • MOSTLY SUNNY
Saturday 23
Sines Municipality
12° / 18°
  • MOSTLY SUNNY
Sunday 24
Sines Municipality
13° / 20°
  • MOSTLY SUNNY
Monday 25
Sines Municipality
13° / 19°
  • PARTLY CLOUDY
REN Atlântico, S.A. Terminal GNL · Apartado 268 7250-903 Sines - Portugal · Phone:(+351) 26 9870 000 · Fax:(+351)26 9870 001
Developed by PROES Consultores, S.A. v1.2